Details: excavation of soil by mechanical means & transporting by mechanical means and unloading the soil within 1 kmt. lead and laying in 22.5 cm. layers to make ready for watering. earth work in slushy soil in water upto 0.6 mt.depth by aid of pan & vessels ramming and rolling of earth work with light h.r.r in embarkments in layers not exceeding 0.3m excavation for foundation in hard soil including all lead & lift. filling in foundation and plinth with sand well watered and rammed including cost of conveyence & royality. filling the foundation with excavated earth cement concrete (1:4:8) with 4cm size hard granite metal in foundation and plinth. cc 1:3:6 with 4cm hg metal including cost of conveyence & royality. rigid smooth centering & shuttering including cost of material & conveyance brickwork with fly ash bricks in cement mortar (1:4) in superstructure. 12mm thick cement plaster (1:4) over brick work laterite stone masonary in cm (1:4) in superstructure. cc (1:2:4) with 12 mm size hg
Sector: Irrigation