Details: cleaning of grass & removal of upto a 50m outside the peripherry of the area for worksite & approach road earth work excavation in hard soil or gravelly soil within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to max.5cm to 7 cm & laying in layers not exceeding 0.3m in depth as per the direction(ug pipe line) earth work excavation in hard soil or gravelly soil within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to max.5cm to 7 cm & laying in layers not exceeding 0.3m in depth as per the direction(recharge pit & platform) earth work excavation in hard soil or gravelly soil within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to max.5cm to 7 cm & laying in layers not exceeding 0.3m in depth as per the direction(recharge pit & platform) with one extra lift cutting embankment for laying intake pipes filling of pebbles/gravels including all cost and transportation etc complete.
Sector: Ground Water Dept