Details: hiring charges of jcb for levelling the ground and sifted to dump area for road accessibility incuding cost,conv,tax,lab,etc,complete. filling in road portion for levelling with good river sand including watering and ramming as directed by the engineer-in-charge of earth work etc. cement concrete (1:4:8) using 40 mm size black hard granite metal of approved quality and from approved quarry including hoisting lowering laying and compacting with watering ,curring ,cost,conveyance, royalties and taxes of all materials ,cost of all labour and t&p required for the work etc, complete cement concrete (1:2:4) using 12 mm size black hard granite chips of approved quality and from approved quarry including hoisting lowering laying and compacting with watering ,curring ,cost,conveyance, royalties and taxes of all materials ,cost of all labour and t&p required for the work etc, complete
Sector: Logistics and warehouses