Details: clearing shurb jungles including uprooting stumps and small bushes and trees below 1m girth on premeasurement including cost of all labour, machineries, t&p b&0cww cess etc. and depositing/removing the materials/ debris away from the work site with all leads and lifts as directed by the engineer-in-charge excavation in canal / foundation of structures by manual/mechanical means in all kinds of soil (this shall include ordinary soil, hard soil, gravelly soil, slushy soil, stoney earth mixed with gravels, pebbles, stone boulders not exceeding 0.028cum by volume, stiff heavy clay, hard shale, compacted moorum soling of road path, sand, silt etc) in both wet and dry condition, shoring, shuttering, proping bullahs, piling, dewatering the foundation, diverting the water away from the structure, dressing, levelling and ramming the foundation bed and sides as per drawing & specification & removing the excavated materials with all leads, lifts and delifts etc. and depositing the excavated mat
Sector: Irrigation