Details: foundation excavation in earth work in hard soil within 50m. initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department etc. complete.etc. complete as per direction of engg-in-charge . filling foundation and plinth with sand and well watered and rammed including cost, conveyance and royalty etc complete as per direction of engg.-in-charge. cement concrete (1:3:6)with 40mm size cbhg metal including cost, conveyance and royalty etc. complete as per direction of engg.-in-charge. fly ash brick masonry in c.m. 1:6 in f & p including cost,conveyance and royalty of materials curing etc. complete. as per the direction of the engineer-in-charge. ist class fly ash brick masonry work in superstructure thoroughl
Sector: Horticulture