Details: earthwork in all kinds of soil upto 1.50 mtr depth in excavation of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including moorum, hard stony earth and earth mixed with boulders except sheet rocks and boulders requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with all leads and lifts, t&p for shoring, shuttering, dewatering if required etc. complete as per the drawing, designing including cost of all labour, t&p etc. as required for the work complete as directed by the engineer-in-charge. r.c.c. work of m-30 having minimum compressive strength of 300kg./cm2 in 15cm cubes at 28 days and in accordance with i.s. 456 and i.s. 516 using and as per specification of morth (4th edition) crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and com
Sector: PWD