Details: supply, installation, testing and commissioning of electric traction lift as per following specifications. the lift should comply with isi specifications with latest technology equipped with following details. installation of new lift includes all required civil works such as two coat of acrylic distemper (as per pwd detailed specifications after proper cleaning of existing surface) of lift well, hoist way and machine room, cleaning of pit and repairing of pit floors and other work related to machine room repairs to accommodate the new equipment, repairing of walls if required and making it suitable to accommodate stainless steel doors at all floors, fixing of bracket, scaffolding, minor building works etc. with cost of materials, labour, t&p, taxes etc. for proper completion of work as per various regulations of fire department and statutes and as per direction of authorized representative of architect incharge.make:otis,thyseenkrup,kone/e
Sector: Urban Authority