Details: a. ground floor earthwork in excavation in all kinds of soil filling in foundation and plinth with sand watered and rammed. cement concrete (1:4:8) in f&p c.c. (1:2:4) in floors 2.5 cm as flooring rcc work of m-20 grade base footing column up to plinth(pedestral) plinth beam cloumn up to roof level lintel stair case chhaja roof beam roof slab and portico supplying,fitting and placing uncoated hysd bar brick work in plinth & foundation work brick work in superstructure work 16 mm thick cement plaster 12 mm thick cement plaster providing fitting,fixing of m.s grill providing fitting,fixing of al door providing fitting,fixing of frp door supplying fitting,fixing of ai framed openable windows cement washing 2 coats over plaster surface priming one coat over the plastered surface finishing walls with water proofing weather coat distempering two coat to walls with distemper priming one coat over the m.s doors,windows and grills. painting two coat enamel paing over the m.s, windows and
Sector: Industries and Factories