Details: reclamation: filling with available earth from local and spreading the lower area of reclamation zone below design formation level of r.l. + 4.50mtr and rolling with 8 to 10 ton roller till the desired density is attend inclduing hire charges etc. complete as per direction of engineer-in-charge.reclamation earth work in excavation of foundation trenches in all kinds of soil including moorum stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and levelling the bed up to 1.50m depth and depositing the excavated materials away from the work site with all leads and lifts by mechanical means etc. complete as directed by the engineer in charge.quay -diaphragm wall , r.c. sloping hard and ramp. 70 m, vehicle parking areas in concrete surface, fish loading area in concrete surface, internal asphalt roads, boat parking / repair yard, fish merchants dormitory, fish handling and auction hall, administrative building, gear shed
Sector: Harbor