Details: earth work in excavation of foundation in all kinds soil or gravelly soil within 50m initial lead &1.5 m initial lift including rough dressing and levelling the bed and depositing the excavated materials away from the working areas including cost of all labour, labour cess and t & p etc. rquired to complete the work in all respect as per specification & direction of engineer in charge. filling foundation & plinth with filling sand well watered and rammed including cost, conveyance, royalty and all other taxes of materials, labour and labour cess and t & p etc required to complete the work in all respect as per specification & direction of engineer in charge. providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors over a layer of polythene using 4 cmdown h.g.c.b metal includig hoisting, laying, compacting, curing and watering etc. with cost conveyance royality and all other taxes of materials, labour and labour cessand t&p etc. required to compelte the
Sector: Harbor