Description: Construction of Museum Park Complex at Mangalpur Name of Work Construction of Museum Park Complex at Mangalpur
Details: Earthwork in excavation upto 1.50mtr depth of foundation trenches for columns, basement, tie beams, walls and steps in following types of soil including moorum, hard stony earth, earth mixed with boulders, Laterite rocks etc but not requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, design including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. Earthwork in excavation beyond 1.50mtr depth of foundation trenches for columns, basement, tie beams, walls and steps in following types of soil including moorum, hard stony earth, earth mixed with boulders, Laterite rock etc but not requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the e
Sector: Irrigation