Details: clearing shrub jungles and uprooting stumps and small bushes and trees below 1 m girth and disposing off debris away from the work site, all labour charges, t&p, b & o.c. workers welfare cess etc. complete as directed by the engineer-in-charge. earth work in excavation in ordinary soil including trimming the slopes and bed to the required section and depositing the excavated soil in canal banks or nearby filling reaches or spoil banks including breaking clods to maximum 5cm to 7cm size and laying in layers not exceeding 0.3m in depth with all leads, lifts & delifts, all labour charges, t&p, b & o.c. workers welfare cess etc. complete as per the specification and as directed by the engineer-in-charge. earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed to required section, breaking clods to maximum 5 cm to 7 cm and depositing the excavated materials away from work site in layers not exceeding 0.3m in depth with all leads, lifts and
Sector: Irrigation