Details: clearing shurb jungles uprooting stumps and small bushes and trees below 1 m grith on premeasurement with all labour charges, all taxes, cess t&p all lead, lift, delifts, rehandling etc but excluding gst and complete the work in all respects as per drawing, design,specification and as per direction of engineer-in-charge. earth work in excavation by mechanical means in all kinds of soil including stoney earth and gravel mixed with boulders not exceeding 0.014 in volume, d.i.rock & slushy soil with all leads, lifts, delifts including dressing and leveling the bed to design section and depositing the excavated materials away from working area in spoil banks with 2 km leads, lifts and delifts including dewatering, shoring, shuttering and propping of bullah piles and construction of coffer dam if required, bailing out water with all cost, conveyance, labour and cess and all other taxes etc. complete but excluding gst and complete the work in all respect as per drawing design and s
Sector: Irrigation