Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used. excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers. excavation in ordinary rock using hydraulic excavator ck-90 and tippers with disposal upto 1000 metres. loosening, leveling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at omc and then compacted by rolling so as to achieve minimum dry density. construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. construction of embankment with approved material obt
Sector: Infrastructure