Details: earth work in ordinary soil including dressing and levling the bed and depositing the soil within 50 mtrs. initial lead and 1.5 mtr. initial lead including rought dressing and breaking clods to maximum 5.00 cm. to 7.00 cm. and layers not exceeding 0.3 m in depth and as per direction of the engineer-in-charge supplying and filling in foundation trenches and plinth , ditches with sand well water and rammed in layers not execeding 23 cm. in depth with all lead and lift including cost , conveyance, loading, un-loading, royality and taxes of all materials , cost of all labour , labour cess, sundries, t&p required for the work etc. complete in all respect as per the direction of the engineer-in-charge providing and laying pcc (1:3:6) in foundation and flors using 4 cm. size hgcb chips and sand of approved quality from approved quarry including laying concrete to required levels in layers , ramming, watering and curring etc. complete with cost, conveyance, royality, taxes of all materials and
Sector: Road development