Details: clearing grass & removal of debrises and up to a distance of 50mtr. out side the periphery of the area and depositing the debrises away from the working area including all t&p etc. complete as per direction of engineer-in-charge. (premeasurement will be taken prior to execution) earth work in all kinds of soil except sand, sandy and slushy soil by manual means with all leads, lifts and delifts including breacking clods maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth etc. complete as per direction of engineer-in-charge. measurement will be taken on finished level section.)
Sector: Irrigation