Details: clearance of shrub jungles uprooting stumps and small bushes below 1m height including stacking them away from worksite with initial lead and lift etc. including labour welfare cess etc. complete as per specification and direction of the engineer-in-charge clearing grass and removal of up to a distance of 50 meters outside the periphery of the area with all labour charges t & p etc. required for the work including labour welfare cess etc. complete as per specification and direction of the engineer-in-charge earth work in ordinary soil desilting from canal bed including dressing and leveling the bed and depositing the excavated soil clear of worksite with one extra lead and one extra lift over the intial lead of 50m. and intial lift of 1.5m including labour welfare cess etc. complete as per direction of the engineer-in-charge painting two coats of weather coat paint over acoat of wall primer to exterior surfaces etc. complete as per direction of the engineer-in-charge cement concrt