Details: non compressive amc with 24hrs operation of central ac plant of institute guest house,fresh air ventillation system of academic/hostel area for 365 days. (the job contract includes maintenance of all low side equipments,,electrical panels, all primary, secondary,condenser , hvac pumps and chilled water pipeline network). sitc for replacement primary heat pump of capacity 25 cubic meter per hour with 7.51 mtr head, rpm 1400(equivalent model of grundfos-a96087447p21107003,the contract includes pipeline modification work, and valve replacement and insulation work) sitc for replacement condenser pump ofcapacity 22 cubic meter per hour with 22.2 mtr head, rpm 1400(equivalent model of grundfos-a96695051p108430003,the contract includes pipeline modification work, and valve replacement and insulation work) sitc for replacement secondary heat pump ofcapacity 1kw,3440-3510 rpm360-480v,ip-55 ,the contract includes pipeline modification work, and valve replacement and insulation work)
Sector: Science University