Details: dewatering the water of d/s area of spillway in bucket portion by using 20hp diesel pump with all hired charges, transportation, fitting charges etc. complete as per the direction of the engineer-in- charges. earth work in stoney earth and gravels mixed with stone and boulders not exceeding 0.014 in volume within all lead and lifts including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding o.3m in depth and as per direction of the enginer in charge excavation loading unloading and carriage by mechanical means of all kinds of soil,including stoney earth,gravel and moorum etc interspread with boulders upto 1/2 size with all lifts and delifts including trimming of slopes etc complete as per the specification and as directed by the engineer in charge within an initial lead of 1km from the place of excavation complete and as per direction of the enginer in charge. preparing of foundation bed in ogee requiring chieselling,hammering and temperi
Sector: Irrigation