Details: earthwork in excavation of foundation in hard soil including dressing & levelling of bed within initial lead of 50mt. & lift of 1.5mtr etc complete as per the direction of the engineer-incharge. filling in foundation & plinth with sand including watering & ramming etc complete as per the direction of the engineer-incharge. cement concrete (1:4:8) with 4cm size h.g.b. hand broken metal of approved quality from approved quarry with ramming watering and curring etc. complete including cost, taxes, royalty convence charge of all material to worksite, supply of cement t&p required etc. complete as per the direction of the engineer-incharge. cement concrete (1:2:4) using 12mm size black hard granite crusher broken chips of approve quality for approve quorry including water and curring with cost taxes royalty and conveyance charges of all material to the worksite and supply of all labour and t&p required for the work etc complete as directed by the engineer-incharge. brick work with fly ash
Sector: Irrigation