Details: clearing and grubbing land including uprooting rank vegetation, grass, bushes, shurbs, saplings and trees girth up to 300 mm removal of stumps etc complete as per direction by the engineer-in-charge. construction of embankment with approved materials obtained from borrow pits with a lift upto 1.5m transporting to site spreading grading to required and compacting to restoration of rain cuts etc complete as per direction by the engineer-in-charge. construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per mord technical specification clause 301 and direction of the engineerincharge etc complete construction of granular sub-base with moorum by providing well graded materials, spreading in uniform layers with grader on prepared surface, mixing by mix in place method with rotavator at omc by mix in place method with rotavator at omc and compacting
Sector: RDPR