Details: clearing shrub jungles uprooting stumps and small bushes and trees below 1m girth on premeasurement and stacking the same away from worksite with all labour , t&p etc. required for the work complete as per specification and direction of the engineer-in-charge. excavation loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc inerspread with boulders upto 0.5 size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work sites per specification and directed by the engineer in charge with in an initial lead of 1km from the place of excavation complete in all respect as directed by the engineer-in-charge .(measurement will be taken on finished level section) execavtion of all kinds of soil including moorum, stoney earth, gravel etc. etc. excepting all kinds of rock and boulders exceeding 0.014 . in volume for dam base stripping, cut-off trenche
Sector: Irrigation