Details: clearing grass & removal of up to a distance of 50mtr outside the peripheri of the area cement washing two coats including all cost , carriage & royality etc complete providing and applying two coats of enamel paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescense and applying paint @ 1 litre per 2 sqm rough stone dry packing in approns & revetments with h.g. stone boulder etc. providing,fixing r.c.c guard post on approach road using 7.50 kg steel in each guard post etc complete providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including pre mixing the material with water at omc in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of mosrt&h specifications for road & bridge works (4th revision). pr
Sector: RDPR