Details: earth work in excavation in foundation in all kinds of soil hard soil or gravelly soil within 50m. initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the engineer-in-charge. filling in foundation and plinth with sand well watered and rammed including cost, carriage and royality of sand etc complete as directed by the engineer-in-charge. r.c.c./cc work of m-15 grade with 20mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying including all cost conveyance of materials etc, complete as directed by the engineer-in-charge. providing formwork for concrete with f1 finish for upstream faces of dam, spillway, glacis of barrages, unexposed surfaces of foundation, block joints etc.with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials and t & p co
Sector: Irrigation