Details: clearing grass and removal of up to a distance of 50m out side the periphery of the area including all cost and conveyance of all materials with all labours, hire and running charges of all machineris, t&p, all taxes, labour cess etc. complete as per the direction of the engineer-in-charge. earth work in ordinary soil in embankments, roads, etc. maximum laboratory dry density not less than 1.44gm/1.52gm/1.65gm per cubic centimeter in road embankments respectively upto 3m/more than 3m high and top 0.5m below sub-grade level within 50m initial lead and 1.5m initial lift from approved borrow pits away from the toe of the final section of the road embankment bottom of the pit not being cut by an imaginary line having a 1:4 projected from the edge of the final section of the bank including rough dressing and breaking clods maximum 5cm. to 7cm and laying in layers each layer not exceeding 23cm in depth upto required level including removal of roots, shrubs, bushes and all foreign debr
Sector: Irrigation