Details: clearing grass and removal of up to a distance of 50 metres out side the periphery of the area with all cost conveyance royalty, taxes of the materials and labour with t&p required for the work etc. complete or as directed by the engineer-in-charge. cleaning the existing black topped surface with removal of foreign materials with brooms or soft btrushes and finally dusting with old gunny bages and/or compressed air to receive bituminous etc complete as per direction of eic. providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including pre mixing the material with water at omc in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of mosrt&h specifications for road & bridge works (4th revision). providing & applying primer coat with bitumen emulsion on pr
Sector: RDPR