Details: clearing and grubbing jungles including uprooting tank vegetation, grass bushes, shrubs, saplings and trees of girth up to 300mm, removal of stumps of trees cut earlier and disposal of unserviciable material and stacking of useful materials with supply of all labour t & p and all taxes as per prevailing norm etc. complete as directed by the engineer-in-charge. dismantling brick or stone masonry in clay, lime or cement mortar including stacking the useful materials for reuse and removing the debris with all leads & lifts including all labour, taxes as per prvailing norm, t & p etc. required for the item & as per direction of engineer-in-charge.moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete excavation of foundation to proper profile in all kinds of soil with all leads and lifts including dressing and leveling the bed to proper and level and making it fit for laying concrete and depositing the excavated mate
Sector: Irrigation