Details: clearing and grubbing road land including uprooting trees rank vegetation, grass, bushes, shrubs, saplings and girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per technical specification clause 202 earth work in embankment with approved materials obtained from borrow pits with all leads and lifts transporting to site,spreading, grading to required and compacting at omc by vibratory roller to meet the requirement of t
Sector: RDPR