Details: clearing grass and removal of up to a distance of 30m outside the perifhery of the area as per technical specification clause 201 of mord by manual means as per the direction e.i.c. excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m scarifying the existing bituminus road surface to a depth of 50m and disposal of scarified material within all lifts and lead upto 1000mt. reworking the scarified bituminus surface suitably after supplementing the base materials with stone screened dust compacting finished surface as per clause no 501.8.3.2 of mort &h specification for raod & bridge works (4th revision) construction of embankment with approved material obtained from borrow pits with all lifts and leads. transporting to site by mechani
Sector: RDPR