Details: dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debries within 50m lead as per direction of eic earth work in stoney earth and gravel mixed with stone and boulder not exceeding 0.014cum in volume within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per specification approved by the department as per direction of the engineer-in-charge cutting in disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing materials within 50m initial lead and 1.5m initial lift including rough dressing as per specification of the department including stacking the useful materials separately as ordered as per direction of the eic filling in foundation and plinth with sand well watered and rammed including cost of labour,materials,royalty,conveyance etc complete as per direction of eic p.c.c (1:
Sector: Generation