Details: labour for scrapping cleaning road surface applying tack coat using 3.00 kg of bitumen for 10 sqm and laying 37.5 mm thick busg in one layerusing 0.45 of 25 mm to 40 mm size granite metal and 12.00 kg bitumenof grade for 10 sqm with 0.12 of 12 mm size chips as key stone for 10 sqm spreading over and laying including heating pouring and spreading over and preading bitumenmetal chips and rlling with prr and all other machineries including cost and conveyance of all materials etc complete providing and applying tack coat with (vg-30)bitumen etc complete including cleaning the surface etc complete providing 20 mm thick premix carpet using 0.27 of 13.2 mm to 5.6 mm size crushed chips and 14.6 kg grade bitumen for 10 sqm including hand packing to proper camber and consolidation with p.r.r including hire and running charges of prr hotmix plant, bitumen boilers and all other t&p articles but excluding cost and conveyance of chips and bitumen complete as per specification and
Sector: RDPR