Details: earth work excavation for plinth and foundation in ordinary soil within 50 mtrs initial lead and 1.5 mtrs initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.30mtrs in depth including mechanical carriage of 5km and as per direction of engineer-in-charge supply and filling in foundation and plinth with sand watered and rammed including the cost, conveyance, royalty, all other taxes and labour charges etc complete cement concrete (1:3:6) with 4cm size hard granite metal including the cost, conveyance, royalty, all other taxes and labour charges etc complete rcc work of m25 (1:1.5:3) with 12mm and down grade black hard granite chips (crusher broken) including hoisting, lowering, laying and compacting concrete, watering and curing and finishing the exposed surface smooth, providing grooves or beds where necessary including cost of all materials (excluding cost of tor steel) and cost of all labour with t&p required as per direction
Sector: Generation