Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used. construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5 kms spreading, grading to required and compacting to meet requirement. scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres including cost conveyance, royalty, cess & taxes of all materials & cost of all labour & t&p required for the work etc complete as per specification & direction of engineer-in charge. providing , laying, spreading and compacting stone aggregates using irc gr-iii size granite metal to water bound macadam specification including spreading in uniform thickne
Sector: RDPR