Details: earth work in ordinary soil with all leads and lifts including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding to 0.30m in depth to proper profile etc. with supply of all labour and t&p required for the work etc. complete in all respect as directed by the engineer-in-charge. (measurement is to be taken on finished level section).1/6th volume will be deducted to wards settlement of embankment only earth work in hard soil with all leads and lifts including dressing and leveling the bed to proper section and profile including rough dressing and breaking clods 5cm to 7cm in size and laying in layers not exceeding 0.3m in depth etc. complete supply of all labour t&p materials complete as directed by the engineer in-charge (measurement is to be taken on finished level section).1/6th volume will be deducted to wards settlement of embankment only excavation of foundation to proper profile in all kinds of soil with all leads and lifts including dress
Sector: Irrigation