Details: dismantling and cement concrete ioncluding stacking useful materials for reuse & removing the debris within 50m lead . earthwork in excavation in cutting in ordinary soil within the initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the enngineer in charge. plain cement concrete m15 grade using 40mm down graded chips in foundation and plinth rough stone dry packing in approns and revetments with hard granite stone (30 cm & above) including cost of all materials etc complete
Sector: RDPR