Details: clearing shrub jungles uprooting stumps and small bushes and trees 1 m girth on premeasurement …etc complete as per the direction of the engineer- in -charge earth work in hard soil within 50m initial lead and 1.5m lifts , laying in layers not exceeding 0.3m in depth in afflux bundh including rough dressing & breaking clod minimum 5cm to 7 cm…. etc complete in all respects as directed by the engineer-in-charge of the work.. ( measurement will be taken on finished level section and payment will be made after deduction of 1/8 voids for settlement) collecting supplying ,stacking good quality moorum of approved quality free from all deterious materials including cost of loading`and unloading wih cost, conveyance taxes, royality including with all lead and lift and spreading the same upto required height over compacted earth with all labour and t&p materials required for the item etc. complete in all respect as directed by the engineer-in- charge. rough stone dry packing in approns a
Sector: Irrigation