Details: cleaning shurb jungle including uprooting stumps & small bushes and trees below 1 m grith on premeasurement ( data for 100 sqm.) excavation of any approved type of soil in approved borrow area by mechanical means and loading into and transportation by mechanical means and unloading the soil on properly prepared and scientifically approved surface including watering earth work upto omc condition and compaction by vibratory roller (8-10 tonne capacity and spreading with ordinary grader attached with tractor in layers not exceeding 22.5 cm to 95% dry density including hire and running charges of all the machineries in embankments of canal for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc complete as per the direction of the engineer in charge. (measurement of the fill to be taken on the finished compacted section under omc condition) etc. as per the direction of the engineer in charge. watering earth work upto omc condition and
Sector: Irrigation