Details: clearing and grubbing road land including uprooting rank vegtable, grass, bushes, shrubs, saplings and trees girth up to 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned up to lead of 1000 mtr including removal and disposal of top organic soil not exceeding 150mm in thickness etc. compete as per direction of the engineer-in-charge . construction of embankment / restoration of rain cuts with selected soil in shoulder by using moorum as per clause 407 of mort&h specifications for road & bridge works with all lead spreading , grading to required and compacting to meet the required table etc. complete. providing and laying surface dressing as wearing course consisting of a layer of bituminous binder laid on the prepared surface followed by a cover of crushed stone aggregates of specific size and rolling with three wheeler 80-100 kn static roller including cleanig the road surface as p
Sector: RDPR