Details: bt roadclearing and grubbing of road land including uprooting rank vegetation grass, bush, shrubs and trees of girth up to 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness with all labour, t&p, taxes & cess etc complete as per direction of engineer-in-charge. earth work in all kinds of soil with in initial lead & lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30 m in depth, well watered and compaction with p.r.r, with all labour, materials, t&p, royalty, taxes and cess etc. complete as per specification and direction of the engineer-in-charge providing, laying, spreding and compacting stone aggregates of specific sizes to water bound macadam specification including spresding in uniform thickness, hand packing,rollin
Sector: RDPR