Details: excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, graval and moorum etc. interspread with boulder upto 1/2 size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and direction of the engineer-in-charge within initial lead of 1.00km from the place of excavation etc. all complete. filling foundation and plinth with sand watered and rammed with all cost of materials, labour,t&p, royalty transpartion charges taxes (excluding gst) etc complete as per direction of engineer-in-charge. c.c. work of m-15 grade with 40mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying including cost,carriage,royality as per direction of engineer-in-charge. r.c.c. work of m-25 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying including co
Sector: Irrigation