Details: clearing grass and removal of to adistance of 50m outside periphery of area on both sides of the road to facilitate widening of berms, disposal of the stuff including all labour, tandp articles required for the work etc.complete as per irc specification for road works and direction of engineer-in-charge. laying for scraping,cleaning,the road surface,applying tack coat using bitumen and laying 37.5mm thick built up spray grouting in one layer using hard granite metal and grade of bitumen in each layer with hard granite chips and keystone for spreading over and laying including fitting curing and spreading over and spreading bitumen metal and chips and rolling with prr including running charges of prr.hot mix plant,bitumen boilers and all other tandp etc complete.as per spoecification for road and bridge works and direction of engineer-in-charge. providing and applying tack coat with bitumen for finished item of work using 0.3 kgs of bitumen per 1 sqm using mechanical mea
Sector: RDPR