Details: earthwork in excavation of foundation in hard soil within initial leads and lifts including rough dressing & breaking clods to maximum 5 cm to 7 cm size & laying in layers not exceeding 0.30m in depth etc. complete as directed by the engineer-in-charge. quarrying, collecting, supplying of hard granite stone boulders of size 30cm and above, free from weathered skin surface and other deleterious materials and dumping the stone boulders in rock toe, rip-rap, spurs and protection work in canal/river embankments including fixing wave breakers and surface packing in all heights and depths including filling the interstices with small stones, wedging and hammering etc. including cost, conveyance, royalty, taxes and transportation of all materials of approved quality and from approved quarry with all leads, lifts, delifts etc. including dumping under water and all other incidental charges required to complete the work as per the specification and direction of engineer-in-charge. quarrying,
Sector: Irrigation