Details: civil worksearth work in excavation in foundation in hard or gravelly soil within 50 mtr. initial lead and 1.5 mtr. initial lift and transporting the same by mechanical means within 5.00 km. lead including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 mtr. depth including cost of all labour, labour cess and t&p for the work etc. complete and as directed by the engineer-in-charge. back filling in foundation & plinth with excavated earth including watering and ramming within 50 mtr. initial lead and 1.5 mtr. initial lift including rough dressing and breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.3 mtr. depth including cost of all labour, labour cess and t&p for the work etc. complete and as directed by the engineer-in-charge. supplying, filling in foundation and plinth with sand in 22.5 cm (9") thick layers including watering and ramming with cost, conveyance, royalties, labour and labour cess with t&p requir
Sector: PWD