Details: clearing grass and removal of up to a distance of 50 metres outside the periphery of the area etc. complete as per direction of the engineer in charge. flank dressing to proper camber on both side berms etc. complete including taxes of all materials with all labour t&p required for the work etc. complete in all respects as per specification and direction of the engineer-in-charge. scraping cleaning the road surface applying tack coat using 3.0kg of bitumen for 10 sqm and laying 37.5mm thick built up spray grouting in one layers using 0.45cum of 25mm to 40mm size hard granite metal and 15.0kg grade of bitumen for 10sqm with 0.12cum of 12mm size hard granite chips as key stone for 10sqm spreading over and laying including heating pouring and spreading over and spreading bitumen metal and chips and rolling with prr including hire and running charges of prr and all other machinaries including cost and conveyance of bitumen,metal and chips etc.complete as per specification and directi
Sector: RDPR