Details: earthwork in excavation of foundation in ordinary soil or gravelly soil within 50mt initial lead and 1mtr initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers to exceeding 0.3min depth including cost of labour t&p etc. complete as per specification and direction of the e.i.c. providing and laying sub-base in layers not exceeding 225mm watering and compacting to the required density in omc with vibratory roller including hire and running charges of vrr etc. complete including cost of labour t&p etc. complete as per specification and direction of the e.i.c. providing laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the materials with water at omc in mechanical mix plant, carrige of mixed materials by tipper to site laying in uniform layers with pavr in sub-base/ base course on well prepared surface & compacting with vibratory roller to achieve the desired density as per clause 406 o
Sector: RDPR