Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201 but excluding the charges of gst etc. complete & as per direction of the engineer-in-charge. providing & applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20kg per sqm on the prepared bituminous / granular surface cleaned with mechanical broom as per clause 503 of mosrt&h specifications for road & bridges work (4th revision) as per direction of the engineer-in-charge. providin & laying semi dense bituminous concret with batch type hot mix plant using crushed aggregates of specified grading, premixed with
Sector: RDPR