Details: civil work excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per direction of eic. construction of embankment with approved materials deposited at site from road-way cutting and excavation from drain and foundation of other structures,graded and compacted to meet requirement of table 300-2 as per appd. drawing and technical specification as per clause 305 of mort&h specifications of road & bridge works (5th revision) filling foundation and plinth with river sand, well watered, rammed including cost, conveyance, royalties of materials, cost of all labour and t&p required for the work etc. complete as per direction of eic. pcc work of m-15 grade concrete in foundation using 20 mm and down graded hard crusher broken granite chips
Sector: Mining