Details: clearing shrub jungles including uprooting stumps and small bushes and trees below 1m. girth based on pre-measurement including clearing the debris and depositing the same clear of work site with all leads & lifts including supply of all labour etc. complete in all respect as directed by the engineer in charge loosening, leveling and compacting original ground to facilitate placement of first layer of embankment, scarified to a depth of 150mm, compacted at omc to achieve minimum dry density conforming to table 300-2 with cost of all labour, machinery etc complete as per technical specifications and clause - 305.3.4 of mort&h specifications for road & bridge works (5th revision). supplying approved quality of coarse sand and laterite moorum for road work, conveying to the work site admixing the both in 40(sand) : 60(moorum) proportion and laying the admixture in sub base in layers not exceeding 100mm in thickness, watering and compacting to the required density with p.r.r. including h
Sector: Irrigation