Description: Construction of New drain in Aska town from 154 200 to 155 000 km of NH157 left over by EPC project For the year 2024 25 Name of Work Construction of New drain in aska town from 154 200 to 155 000 km of NH 157 left over by EPC project For the year 2024 25
Details: Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50M lead. Dismantling and removing RCC columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50M lead. Earth work in excavation of foundation in hard soil including dressing and leveling the bed and depositing the soil within 50 m initial lead and 1.5 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 m in depth and as per direction of the Engineer-in-charge. Cleaning , sludge, weeds , liquid earth, mud etc. from road side masonry open drain/ nikashi etc. by mathor labour, removing the sludge etc. by using iron pans, buckets including all labour, tools and plants including expulsion of impure/ inflamable/ asphyxiating gases from the drain etc. and removing thespoils in dry condition and disposing the same by truck beyond the
Sector: Road development