Details: labour for rubbing out heavy moss from shift walls exposed to weather with all labour charges and cess etc. complete and as per the direction of the engineer-in-charge. cement concrete (1:2:4) with 12 mm size hard granite crusher broken chips including all cost, conveyance, royalty of all materials with all labour charges and cess etc. complete and as per the direction of the engineer-in-charge. 12 mm thick cement plaster in (1:6) cement mortar including all cost, conveyance, royalty of all materials with all labour charges and cess etc. complete and as per the dirrection of the engineer-in-charge. priming one coat of wall surface including all cost, conveyance of all the materials with all labour charges and cess etc. complete and as per the direction of the engineer-in-charge. painting two coat with approved paint for wall surface including all cost, conveyance of all materials with all labour charges and cess etc. complete and as per the direction of the engineer-in-charge.
Sector: Irrigation